From and Outdated to Modern and Fresh
Etobicoke, Toronto — full bathroom gut renovation with a freestanding tub, new walk-in shower, and the root cause of a hidden mold problem fixed for good.
Full bathroom gut renovation
Mold & roof leak remediation
Freestanding tub install
In-house design & construction

An outdated bathroom hiding a bigger problem
The existing bathroom was messy, moldy, and worn out — an old alcove tub, a tired walk-in shower well past its life, and a layout that no longer worked for the homeowners. They came to us wanting a full refresh: a new freestanding tub, a rebuilt walk-in shower, and a new vanity.
Once we opened up the walls, we found the real issue: mold had been growing behind the walls, caused by two separate roof leaks letting water travel down into the bathroom area over time. What looked like an outdated bathroom was also a hidden moisture problem that needed to be fixed at the source, not just covered up.
What we found behind the walls
Mold had developed from water tracking down from two roof leaks above the bathroom. Both leaks were repaired and the affected framing and drywall were fully remediated before any new finishes went in.



01
Demolition
We gutted the bathroom completely — removing the old tub, shower base, vanity, and all fixtures down to the studs, so we could rebuild everything from zero.
02
Mold & Leak Remediation
With the walls open, we found mold caused by two roof leaks tracking water down into the bathroom. We repaired both leaks at the source and fully removed the affected mold and framing before continuing.
03
Plumbing & Electrical
New plumbing rough-in for the freestanding tub location, the rebuilt walk-in shower, and the new vanity, along with updated electrical for lighting and fixtures.
04
Waterproofing
A full waterproofing membrane was installed throughout the wet areas before tiling — especially important given what we'd just found behind the old walls.


05
Tile, Fixtures & Accessories
Tile installed through the shower and floor, followed by the freestanding tub, new walk-in shower glass, vanity, and all fixtures and accessories.
06
Paint & Final Walkthrough
Final paint, a full clean, and a walkthrough with the homeowners to confirm every detail before handing back the keys to a bathroom that finally works — and no longer hides a moisture problem.
A beautiful, modern bathroom — and no more hidden mold
The old alcove tub is gone, replaced with a freestanding tub. The worn walk-in shower has been fully rebuilt with new tile and glass. A new vanity completes the space — and just as important, the roof leaks that caused the original mold problem are fixed, with proper waterproofing now protecting the space going forward.


Mold fully remediated
Root cause (roof leaks) repaired, not just covered up
Licensed & permitted
Plumbing and electrical work permitted and inspected
One in-house team
Design, engineering & construction, no subs
$5M insurance & WSIB
Commercial liability + WSIB covered
2-year warranty
Minimum on all completed work
Zero failed inspections
Clean record since founding