PROJECT STORY - MARKHAM STREET, TORONTO
A two-storey addition built around a bigger kitchen and a new primary suite
We gutted the first and second floors, built a two-storey addition at the back, and supplied and installed a new kitchen — Markham Street, Toronto.
2-storey addition
Full floor gut
New kitchen addtion
New primary suite
The homeowner wanted a bigger kitchen downstairs and a new primary suite upstairs. We gutted both floors to make it happen.
Work started in late spring, when we removed the old rear deck to open up the build site.
Demolition and structural phase
Getting the permit approved added a few weeks at the start. After that, the build moved smoothly through framing and outside finishing.

Old deck removal

Rear wall removal

Foundation work
Once the old rear wall was open, our crew poured and waterproofed the new foundation, then built the block walls to support the two-storey structure above.

Foundation work

New concrete slab
On the main floor, the new addition made room for a custom kitchen and an open dining area with sliding doors to the yard. We moved the plumbing and electrical to fit the new layout, and we supplied and installed the kitchen.
Upstairs, the addition made room for a new primary suite.

Newly added addition interior

Exterior addition

2nd floor bedroom

New kitchen
WSIB coverage
You have no liability if one of our workers gets hurt on the job
Fully permitted
We take care of your permit and inspection process
One in-house team
Design, engineering, and construction
$5M insurance
Commercial liability for peace of mind
2-year warranty
Minimum on all completed work
Design included
At no additional cost
Home addition common questions
How long does a two-storey addition take?
Construction usually takes 3 to 6 months once permits are approved. A second-storey addition on its own takes about 5 months. Add a rear extension, and it's closer to 6 or 7 months. The Markham Street project matched this timeline, running from late spring to late summer, including the wait for permits.
Do I need a permit for a two-storey addition?
Yes. Every home addition in Toronto needs a building permit. You'll also need architectural drawings and structural engineering calculations, plus separate electrical and plumbing permits. Permit review usually takes 4 to 12 weeks.
Can you renovate both floors while building the addition?
Yes, we do this often. We renovate your existing floors at the same time as we build the addition, instead of doing it as a separate project.
Do you supply the kitchen as part of an addition?
Yes, when it's part of the project. We supply and install the kitchen ourselves instead of using an outside vendor.
Will you relocate my plumbing and electrical?
Yes. Moving water and electrical lines to fit a new layout is a normal part of this kind of addition, and our own team handles it.